Great wall is a large professional slag grinding mill supplier

14 Jan,2016 UTC+8 Views:


As the important equivalent substitutes for cement production, slag powder can not only significantly improve the overall performance of cement and concrete, but also significantly reduce the production cost. Now it has been widely used in cement plant, grinding station and steel factories as a new kind of high effectively admixtures. For this situation, we may say: "who first invests will first benefits."

Nickel SlagGGBSSteel SlagManganese Slag

  Steel Slag                                       GGBS                                           Steel Slag                        Manganese Slag

Also, Great Wall Machinery has constructed the first 600,000 t/a slag grinding line in this industry, with a waste slag (like blast furnace slag, Steel slag and nickel slag) analysis center .With the rich industry experience and advanced technology, Great Wall Machinery can provide the qualified turnkey service from research report, raw materials analysis, designing, equipment manufacturing, civil construction, installation, test and training.

Slag grinding line investment returns analysis

Take our 600,000 t/a slag power production line as an example, the total investment of this project is RMB 50 million. It took into production on April, 2011. Within 2 years, all the investments has returned and now is benefits. The investment details list as below:

 

Project
Indicator
Practical operation
Start date
Date of start running
April 2011
Investment calculations
Total investment
50 million
Cost calculation
Raw material cost
70YUAN/T
Production costs(including salaries, electricity, coal, and maintenance management fees, sales charges, and so on)
50 YUAN
Profit calculation
Market sales prices
160 YUAN/T
Tons of profits
40 YUAN/T
Annual profit
40×600,000=24 million
Economic benefits
Within 2 years, all the investments returned (currently in a State of pure profit)
Slag powder quality
Fineness
500 m2/kg
7d Activity index
About 100%
Activity index
Pass GB S95

  Suggestions for the equipment selection

  Great Wall Machinery already has more than more than 100 customers recently, among them, the capacity of 1 million t/a, 600,000 t/a and 300,000 t/a has occupied more than 80%. Below sheet has show the main equipment specs and parameters of these three capacities.

Product specifications
GRMS53.41
GRMS46.41
GRMS33.31
Annual production(tons)
1,000,000
600,000
300,000
Designed production(t/h)
150
90
45
Raw materials
input amount(t/h)
188
125
65
Actual output(t/h)
160
105
55
Final products
fineness(m
2/Kg)
500
500
500
Power consumption
(KWh/t)
26.5
28.5
30
System power
consumption(KWh/t)
35
37
42
Coal consumption 
(equivalent to standard
coal)(kg)
17
18
18
Metal recovery of
per ton slag(%)
0.2-0.3
0.2-0.3
0.2-0.3

Related Equipment

  Why choose vertical mill for slag grinding ?

  Energy-saving, environment friendly, simple process, high intelligence

  Nowadays, the slag vertical roller mills are widely accepted by customers, but some customers may still doubt about the vertical roller mill and ball mill. By doing research in more than 10 customers factory, we have summed up these difference between this two kinds of mills.