Hebei Tangshan 1000000t/a slag powder production line EPC project

18 Sep,2018 UTC+8 Views:


Raw material: slag

Main equipment configuration: GRMS53.41 slag vertical mill

Production time: July 2018

slag grinding plant

Project introduction: the owner of this project built this line according to the local conditions and makes full use of the rich slag resources and convenient transportation in Tangshan. And the planned output is 1000000t/a and the slag powder produced by this project planned to be sold to coastal cities in Guangdong and surrounding countries. This project was finished in July 2018, and the power consumption of the system is 35 kwh with capacity of 160t/h. After it went into operation, all equipment runs stably and this project reached the designed output and standard.